蜜臀av性久久久久|国产免费久久精品99|国产99久久久久久免费|成人精品一区二区三区在线|日韩精品一区二区av在线|国产亚洲欧美在线观看四区|色噜噜综合亚洲av中文无码|99久久久国产精品免费播放器

<cite id="ygcks"><center id="ygcks"></center></cite>
  • 
    
  • <rt id="ygcks"></rt>
    <cite id="ygcks"></cite>
  • <li id="ygcks"><source id="ygcks"></source></li> <button id="ygcks"></button>
  • <button id="ygcks"></button>
    <button id="ygcks"><input id="ygcks"></input></button>
    
    
    <abbr id="ygcks"><source id="ygcks"></source></abbr>
    
    
    
     
    
    

    Chinese company to conduct feasibility study for Bangladesh's first high speed railway project

    Source: Xinhua| 2018-06-01 01:12:13|Editor: mmm
    Video PlayerClose

    DHAKA, May 31 (Xinhua) -- The Bangladeshi government has relied on a Chinese engineering giant to conduct a feasibility study and carry out detailed design for construction of the 230-km high-speed railway from capital Dhaka to seaport city Chittagong, officially known as Chattogram.

    The proposed Dhaka-Chattogram rail route is set to be the first stretch to be explored for the Bangladesh Railway sector's first high-speed railway project.

    Bangladesh Railway Thursday signed an agreement with China Railway Design Corporation (CRDC) to conduct the feasibility study and detailed design.

    Md Quamrul Ahsan, project director, and the authorized representative of CRDC, signed the agreement on behalf of their respective sides here on Thursday.

    According to the agreement, the feasibility study and detail design work will be completed within 18 months.

    The Chinese consultant firm, in cooperation with Bangladesh Railway and Mazumder Enterprise, a Bangladeshi consultancy firm, will conduct the feasibility study.

    At the signing ceremony, Bangladeshi Railway Minister M. Mazibul Hoque said Dhaka-Chattogram railway is very important.

    Upon fruition, it will cut the traveling time from Dhaka to Chattogram by two hours as the new route of the proposed high-speed train would reduce the distance between the country's two largest cities by about 90 km.

    The train will run at a speed of 200 km per hour on the new rail link.

    The existing Dhaka-Chattogram rail link runs for 320 km and it's a journey of seven to ten hours.

    Officials said the preliminary work will be completed by 2019 and then the ministry will invite tender to construct the country's first high-speed railway.

    With daily traffic of tens of thousands, Dhaka-Chattogram highway and rail way are the main transportation arteries in Bangladesh.

    TOP STORIES
    EDITOR’S CHOICE
    MOST VIEWED
    EXPLORE XINHUANET
    010020070750000000000000011100001372212771
    清水县| 临高县| 武威市| 沙田区| 磴口县| 漳浦县| 昭觉县| 湖口县| 土默特右旗| 西华县| 深州市| 大城县| 融水| 乐昌市| 陆丰市| 永嘉县| 阿瓦提县| 永川市| 青田县| 南通市| 开远市| 云和县| 轮台县| 体育| 雅江县| 虎林市| 旺苍县| 衡阳县| 吴旗县| 鲁甸县| 嘉祥县| 陇西县| 河间市| 高密市| 西安市| 五原县| 阜阳市| 巴中市| 剑川县| 金沙县| 泾阳县|