蜜臀av性久久久久|国产免费久久精品99|国产99久久久久久免费|成人精品一区二区三区在线|日韩精品一区二区av在线|国产亚洲欧美在线观看四区|色噜噜综合亚洲av中文无码|99久久久国产精品免费播放器

<cite id="ygcks"><center id="ygcks"></center></cite>
  • 
    
  • <rt id="ygcks"></rt>
    <cite id="ygcks"></cite>
  • <li id="ygcks"><source id="ygcks"></source></li> <button id="ygcks"></button>
  • <button id="ygcks"></button>
    <button id="ygcks"><input id="ygcks"></input></button>
    
    
    <abbr id="ygcks"><source id="ygcks"></source></abbr>
    
    

    China-Laos railway completes first continuous beam block construction on Mekong River

    Source: Xinhua| 2018-09-22 16:57:02|Editor: Liangyu
    Video PlayerClose

    LAOS-LUANG PRABANG-CHINA-RAILWAY CONSTRUCTION-PROGRESS

    Photo taken on Sept. 21, 2018 shows the Luang Prabang cross-Mekong River super major bridge under construction by the China Railway No.8 Engineering Group (CREC-8) in Luang Prabang, Laos. The concrete casting for the first block of the Luang Prabang cross-Mekong River super major bridge's continuous beam along the China-Laos Railway was completed on Sept. 17, the Chinese contractor told Xinhua on Saturday. (Xinhua/Liu Ailun)

    LUANG PRABANG, Laos, Sept. 21 (Xinhua) -- The concrete casting for the first block of the Luang Prabang cross-Mekong River super major bridge' continuous beam along the China-Laos Railway was completed on Sept. 17, the Chinese contractor told Xinhua on Saturday.

    Yan Haiyong, CPC party secretary of the China Railway No.8 Engineering Group (CREC-8)'s railway project department, who is in charge of the construction of the two bridges across the Mekong along the China-Laos Railway, said that the Luang Prabang railway bridge with a total length of 1458.9 meters, is a key project of the China-Laos Railway.

    According to Yan, the bridge's continuous beam design has high technical standards and is difficult to construct with pier-side bracket. The first block of the continuous beam has a length of 12 meters and consumes a concrete volume of 266 cubic meters.

    The China-Laos Railway starts from the border between China and Laos in northern Laos and ends in Vientiane, the capital of Laos. It is the first overseas railway project to be invested, constructed and operated jointly by the Chinese side and directly connected to the Chinese railway network.

    The China-Laos Railway is 414 km long, of which the bridge is about 62 km long and the tunnel is about 198 km long.

    The China-Lao Railway adopts Chinese technical standards and uses Chinese equipment. It started construction in December 2016. It is scheduled to be completed and open to traffic in December 2021.

    The project is designed, constructed and operated in accordance with Chinese railway standards and has a design operating speed of 160 km per hour.

       1 2 3 Next  

    KEY WORDS: China-Laos
    EXPLORE XINHUANET
    010020070750000000000000011100001374864281
    长兴县| 凉城县| 那坡县| 房产| 恩施市| 和顺县| 鹤峰县| 方正县| 乐安县| 太和县| 渝中区| 涿州市| 东海县| 峡江县| 德格县| 大兴区| 泸州市| 建水县| 宣汉县| 永州市| 吉木乃县| 儋州市| 南和县| 新乡市| 扬州市| 景谷| 邯郸县| 凯里市| 桃园县| 芮城县| 休宁县| 新建县| 凤庆县| 邛崃市| 广安市| 岢岚县| 肃宁县| 长葛市| 乾安县| 龙口市| 高州市|